
Redoing the bathroom? Put the shower door, the mirror, and the hardware in one order instead of buying them from three places.
Here's how a lot of remodels end up: The shower door comes from one company and the mirror from another. Then the towel bar is whatever the hardware store had in stock. You get three "brushed nickel" finishes that don't quite match, and you notice it every morning.
When we handle all of it, the hardware finish and the glass edges match from the shower to the vanity. You also get one measuring visit, not three, and one person to call if something needs to change before install.


Here is everything our bathroom remodel glass package includes:
Custom frameless shower doors and enclosures, built to your exact opening in whatever layout suits the room.
Clear glass, U-channel, and a no-charge finish keep costs down, while low-iron glass, clamps, and premium satin brass will make the total higher.
A vanity mirror made to size for your wall, part of our custom mirror work. We pick the edge and mounting to go with the shower glass and hardware.


You pick one finish, and we carry it across the shower door, the mirror mounts, and any other glass in the room.
Chrome, brushed nickel, matte black, and oil rubbed bronze cost nothing extra. Polished nickel, satin brass, and brushed bronze are premium and cost more. Handles matter too: an 8" ladder pull is $50 more, and a towel bar (or towel bar and pull combo) is $150 more.
It starts with one $75 appointment for the design consultation and measure, and we waive or credit that fee if you go ahead with us. We measure the shower opening and the mirror wall on the same visit. Final measurements wait until the tile is set. Open framing can't tell us where the finished surfaces will land, and the glass has to meet them on every edge.
Everything goes on one order, so the hardware finish and edge work stay the same on every piece. If your remodel schedule allows it, we'll install the shower and mirror glass in one trip. Delivery is included, along with hauling away your old shower door and cleaning up after. We handle the glass and metal. Tile, plumbing, paint, carpentry, and lights stay with your other trades.
Most jobs take 2 to 4 weeks from measure to install. Once the glass is in, give the silicone 24 hours to cure before anyone showers.


We measure every piece to your actual room. Nothing comes off a stock size chart, and our own team does the install.
Every shower we put in comes with the GCS lifetime limited craftsmanship warranty. For the mirror and other pieces, ask us what's covered. Quotes are good for 10 days, and a 50% non-refundable deposit starts fabrication. We do bathroom glass packages in Phoenix, Denver, and Long Island.
Bring a rough timeline, any tile or fixtures you've already picked, and a few photos of the bathroom as it is now. That helps us scope things before the measure visit. Haven't settled on tile or a vanity yet? No problem. We can sort out glass and hardware finishes alongside those choices, so you don't have to wait until everything else is locked in.
Tell us about your remodel and get a quote for your shower door, mirror, and hardware as one project. Call or text our team with questions about coordinating the pieces.
We pride ourselves in having fast and professional staff that are always ready to help you with your next project.
